![](https://newrepublicarchitecture.b-cdn.net/wp-content/uploads/2021/09/Adams-Edge_Land-Image-C-11.jpg)
![](https://newrepublicarchitecture.b-cdn.net/wp-content/uploads/2021/09/Adams-Edge_Land-Image-C-05.jpg)
New Republic addressed several geotechnical concerns with the site. Hillside slippage, a decaying city retaining wall, and extreme topography all made the site challenging to develop.
![](https://newrepublicarchitecture.b-cdn.net/wp-content/uploads/2021/09/Adams-Edge_Land-Image-B.jpg)
64 Units
Total SF: 60,000+
New Republic addressed several geotechnical concerns with the site. Hillside slippage, a decaying city retaining wall, and extreme topography all made the site challenging to develop.